Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsNAICS | 3371 | Household and Institutional Furniture and Kitchen Cabinet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0483 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,147 | $500 | Implemented |
SD0483 # 01 Y:2014 | 01 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,026 | $61,400 | Implemented |
SD0483 # 07 Y:2014 | 07 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $783 | $500 | Implemented |
SD0483 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $7,108 | $21,254 | Not Implemented |
SD0483 # 03 Y:2014 | 03 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,486 | $2,845 | Implemented |
SD0483 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,563 | $3,243 | Implemented |
SD0483 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,633 | $2,600 | Implemented |
SD0374 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,769 | $140 | Implemented |
SD0374 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,046 | $52,243 | Implemented |
SD0374 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $688 | $350 | Implemented |
SD0374 # 04 Y:2005 | 04 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,982 | $220 | Implemented |
SD0374 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,927 | $7,500 | Implemented |
SD0374 # 05 Y:2005 | 05 | 2005 | COVER OPEN TANKS | $2,000 | $4,500 | Not Implemented |
SD0374 # 01 Y:2005 | 01 | 2005 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $27,800 | $0 | Not Implemented |
SF0302 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,557 | $11,268 | Not Implemented |
SF0302 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $337 | $748 | Not Implemented |
SF0302 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $474 | $1,638 | Implemented |
SF0302 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $600 | $2,584 | Implemented |
SF0302 # 06 Y:2005 | 06 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $2,069 | $15,913 | Not Implemented |
SF0302 # 07 Y:2005 | 07 | 2005 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $1,800 | $250 | Implemented |
SF0302 # 08 Y:2005 | 08 | 2005 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $1,200 | $0 | Implemented |
SF0302 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $0 | Implemented |
LM0089 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,655 | $4,550 | Not Implemented |
LM0089 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $368 | $150 | Not Implemented |
LM0089 # 05 Y:2005 | 05 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,400 | $0 | Implemented |