Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 3371 | Household and Institutional Furniture and Kitchen Cabinet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2312 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,943 | $30,989 | Not Implemented |
UW2312 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,868 | $20 | Not Implemented |
UW2312 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,841 | $1,520 | Not Implemented |
UW2312 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $236,659 | $2,614,888 | Not Implemented |
UW2312 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $10,128 | $13,235 | Not Implemented |
WV0644 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,092 | $29,560 | Not Implemented |
WV0644 # 10 Y:2023 | 10 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $76 | $368 | Implemented |
WV0644 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $310 | $592 | Implemented |
WV0644 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $459 | $1,293 | Implemented |
WV0644 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $523 | $1,573 | Implemented |
WV0644 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $100 | Implemented |
WV0644 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $954 | $1,965 | Implemented |
WV0644 # 04 Y:2023 | 04 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $4,007 | $10,420 | Not Implemented |
WV0644 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,500 | $1,023 | Implemented |
WV0644 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $23,558 | $12,360 | Not Implemented |
WV0644 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $21 | $31 | Implemented |
LE0547 # 02 Y:2023 | 02 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,446 | $1,500 | Not Implemented |
LE0547 # 05 Y:2023 | 05 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,147 | $30,000 | Not Implemented |
LE0547 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $602 | $1,720 | Implemented |
LE0547 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,448 | $13,930 | Implemented |
LE0547 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $846 | $400 | Implemented |
OK1086 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,012 | $1,489 | Implemented |
OK1086 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,948 | $382,200 | Not Implemented |
OK1086 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $330 | Implemented |
OK1086 # 03 Y:2023 | 03 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $8,472 | $13,560 | Not Implemented |