IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

274

matching recommendations
Reset
NAICS 33711 Wood Kitchen Cabinet and Countertop Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0714 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,690 $41,900 n/a
CO0714 # 04 Y:2015 04 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $9,310 $36,000 n/a
CO0714 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,650 $240 n/a
CO0714 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,700 $1,530 n/a
CO0706 # 05 Y:2015 05 2015 USE SOLAR HEAT TO HEAT MAKE-UP AIR $1,490 $9,550 Not Implemented
CO0706 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,210 $57,920 Implemented
CO0706 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,400 $1,670 Not Implemented
CO0706 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,510 $1,200 Implemented
CO0706 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,710 $28,880 Not Implemented
UA0129 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,212 $7,095 Implemented
UA0129 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $15,672 $5,250 Not Implemented
UA0129 # 06 Y:2014 06 2014 UPGRADE CONTROLS ON COMPRESSORS $35,918 $45,024 Not Implemented
UA0129 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $44,851 $100 Implemented
UA0129 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $263 $331 Implemented
UA0129 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,794 $38,871 Not Implemented
UA0129 # 02 Y:2014 02 2014 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $34,652 $100 Implemented
UA0129 # 01 Y:2014 01 2014 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $72,413 $8,000 Not Implemented
CO0671 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $850 $2,190 Not Implemented
CO0671 # 01 Y:2013 01 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $62,960 $65,530 Implemented
AM0607 # 06 Y:2012 06 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,130 $1,200 Implemented
AM0607 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $109,000 $10,900 Implemented
AM0607 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $42,700 $60,200 Implemented
AM0607 # 08 Y:2012 08 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $100 $0 Implemented
AM0607 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $620 Implemented
AM0607 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $500 Not Implemented