Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
311
matching recommendationsNAICS | 337121 | Upholstered Household Furniture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0324 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,020 | $1,991 | Implemented |
UU0085 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,550 | $1,110 | Not Implemented |
UU0085 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,960 | $600 | Not Implemented |
UU0085 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,110 | $405 | Not Implemented |
UU0085 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,090 | $21,620 | Not Implemented |
UU0085 # 05 Y:2005 | 05 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,300 | $940 | Not Implemented |
UU0085 # 06 Y:2005 | 06 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $390 | $1,300 | Not Implemented |
UU0085 # 07 Y:2005 | 07 | 2005 | INSULATE FEEDWATER TANK | $150 | $200 | Not Implemented |
LE0206 # 01 Y:2005 | 01 | 2005 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $135,669 | $50,000 | Not Implemented |
LE0206 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,193 | $5,000 | Implemented |
LE0206 # 03 Y:2005 | 03 | 2005 | INSTALL BACK-UP EQUIPMENT | $11,880 | $14,100 | Implemented |
LE0206 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,905 | $2,500 | Not Implemented |
LE0206 # 05 Y:2005 | 05 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,894 | $2,200 | Not Implemented |
LE0206 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $683 | $200 | Implemented |
LE0206 # 07 Y:2005 | 07 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $63,361 | $382,500 | Not Implemented |
LM0089 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $380 | Implemented |
LM0089 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $163 | $0 | Not Implemented |
LM0089 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,655 | $4,550 | Not Implemented |
LM0089 # 04 Y:2005 | 04 | 2005 | INSTALL OCCUPANCY SENSORS | $368 | $150 | Not Implemented |
LM0089 # 05 Y:2005 | 05 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $26,400 | $0 | Implemented |
LM0089 # 06 Y:2005 | 06 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $7,090 | $800 | Implemented |
LE0202 # 01 Y:2004 | 01 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $24,240 | $29,000 | Not Implemented |
LE0202 # 02 Y:2004 | 02 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,420 | $13,640 | Implemented |
LE0202 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,378 | $2,500 | Implemented |
LE0202 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $879 | $0 | Implemented |