IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

311

matching recommendations
Reset
NAICS 337121 Upholstered Household Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0324 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $1,991 Implemented
UU0085 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,550 $1,110 Not Implemented
UU0085 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,960 $600 Not Implemented
UU0085 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,110 $405 Not Implemented
UU0085 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,090 $21,620 Not Implemented
UU0085 # 05 Y:2005 05 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,300 $940 Not Implemented
UU0085 # 06 Y:2005 06 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $390 $1,300 Not Implemented
UU0085 # 07 Y:2005 07 2005 INSULATE FEEDWATER TANK $150 $200 Not Implemented
LE0206 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $135,669 $50,000 Not Implemented
LE0206 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,193 $5,000 Implemented
LE0206 # 03 Y:2005 03 2005 INSTALL BACK-UP EQUIPMENT $11,880 $14,100 Implemented
LE0206 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,905 $2,500 Not Implemented
LE0206 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,894 $2,200 Not Implemented
LE0206 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $200 Implemented
LE0206 # 07 Y:2005 07 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $63,361 $382,500 Not Implemented
LM0089 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $380 Implemented
LM0089 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $163 $0 Not Implemented
LM0089 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,655 $4,550 Not Implemented
LM0089 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $368 $150 Not Implemented
LM0089 # 05 Y:2005 05 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,400 $0 Implemented
LM0089 # 06 Y:2005 06 2005 MODIFY MATERIAL APPLICATION METHODS $7,090 $800 Implemented
LE0202 # 01 Y:2004 01 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $24,240 $29,000 Not Implemented
LE0202 # 02 Y:2004 02 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,420 $13,640 Implemented
LE0202 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $2,500 Implemented
LE0202 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $879 $0 Implemented