IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

528

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0772 # 06 Y:2007 06 2007 UPGRADE CONTROLS ON COMPRESSORS $11,132 $25,500 Not Implemented
UD0772 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,540 $58,765 Implemented
UD0772 # 08 Y:2007 08 2007 UPGRADE CONTROLS ON COMPRESSORS $7,421 $17,000 Implemented
UD0772 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,068 $0 Not Implemented
UD0772 # 10 Y:2007 10 2007 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,744 $600 Not Implemented
UD0772 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,297 $3,275 Implemented
UD0772 # 12 Y:2007 12 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $530 $930 Not Implemented
DL0005 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,373 $0 Implemented
DL0005 # 02 Y:2007 02 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $167,986 $65,000 Implemented
DL0005 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $92,780 $18,375 Implemented
DL0005 # 04 Y:2007 04 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,554 $1,772 Implemented
DL0005 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $24,677 $10,000 Not Implemented
DL0005 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,314 $108,987 Implemented
DL0005 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,951 $80,000 Not Implemented
UD0759 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,130 $0 Implemented
UD0759 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,549 $40,500 Not Implemented
UD0759 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,675 $0 Implemented
UD0759 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,276 $0 Implemented
UD0759 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $0 Implemented
UD0759 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $500 Implemented
UD0759 # 07 Y:2007 07 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $534 $0 Not Implemented
UD0759 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $266 $0 Not Implemented
UD0759 # 09 Y:2007 09 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $173 $0 Not Implemented
MA0615 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,604 $84,300 Implemented
MA0615 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,050 $100,800 Not Implemented