Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
571
matching recommendationsNAICS | 33721 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0005 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,373 | $0 | Implemented |
DL0005 # 02 Y:2007 | 02 | 2007 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $167,986 | $65,000 | Implemented |
DL0005 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $92,780 | $18,375 | Implemented |
DL0005 # 04 Y:2007 | 04 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,554 | $1,772 | Implemented |
DL0005 # 05 Y:2007 | 05 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,677 | $10,000 | Not Implemented |
DL0005 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,314 | $108,987 | Implemented |
DL0005 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,951 | $80,000 | Not Implemented |
UD0759 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,130 | $0 | Implemented |
UD0759 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,549 | $40,500 | Not Implemented |
UD0759 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,675 | $0 | Implemented |
UD0759 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,276 | $0 | Implemented |
UD0759 # 05 Y:2007 | 05 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,440 | $0 | Implemented |
UD0759 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $664 | $500 | Implemented |
UD0759 # 07 Y:2007 | 07 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $534 | $0 | Not Implemented |
UD0759 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $266 | $0 | Not Implemented |
UD0759 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $173 | $0 | Not Implemented |
MA0615 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,604 | $84,300 | Implemented |
MA0615 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,050 | $100,800 | Not Implemented |
MA0615 # 03 Y:2007 | 03 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,125 | $0 | Implemented |
MA0615 # 04 Y:2007 | 04 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,561 | $53,848 | Not Implemented |
MA0615 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,214 | $800 | Implemented |
MA0615 # 06 Y:2007 | 06 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $10,518 | $13,000 | Implemented |
MA0615 # 07 Y:2007 | 07 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,155 | $0 | Implemented |
MA0615 # 08 Y:2007 | 08 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,499 | $15,500 | Not Implemented |
MA0615 # 09 Y:2007 | 09 | 2007 | OPTIMIZE PLANT POWER FACTOR | $4,673 | $18,500 | Implemented |