IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 33721 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0406 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $126 $145 Implemented
SU0406 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $337 Implemented
SU0406 # 03 Y:2016 03 2016 ELIMINATE/REDUCE AN OPERATION $3,795 $1,535 Not Implemented
SU0406 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $0 Implemented
SU0406 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,885 $0 Implemented
SU0391 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $716 $367 Implemented
SU0391 # 01 Y:2015 01 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $9,598 $5,243 Implemented
SU0391 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,180 $2,800 Not Implemented
SU0391 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,843 $97,500 Not Implemented
SU0391 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,806 $2,683 Not Implemented
SU0391 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $938 $1,414 Implemented
SU0391 # 07 Y:2015 07 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $584 $2,876 Not Implemented
SU0391 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,885 $9,310 Not Implemented
SU0171 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,145 $27,936 Not Implemented
SU0171 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $10,041 $7,458 Implemented
SU0171 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,759 $950 Implemented
SU0171 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $715 $213 Implemented
SU0171 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,485 $0 Implemented
SU0171 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,713 $0 Implemented
SU0169 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,694 $0 Implemented
SU0169 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,846 $7,106 Not Implemented
SU0169 # 05 Y:2003 05 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,608 $9,520 Not Implemented
SU0169 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $168 Implemented
SU0169 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,194 $26 Implemented
SU0169 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $53,040 $348 Implemented