IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

564

matching recommendations
Reset
NAICS 33721 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0287 # 10 Y:2005 10 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $0 Implemented
BD0287 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $568 $440 Not Implemented
BD0287 # 12 Y:2005 12 2005 USE SYNTHETIC LUBRICANT $564 $600 Implemented
BD0287 # 13 Y:2005 13 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,040 $140 Implemented
CO0561 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,890 $4,100 Not Implemented
CO0561 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,380 $270 Not Implemented
CO0561 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $700 $2,760 Not Implemented
CO0561 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $240 $480 Not Implemented
CO0561 # 05 Y:2004 05 2004 INSTALL SKYLIGHTS $10,440 $90,000 Not Implemented
CO0561 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,460 $29,920 Not Implemented
CO0561 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $640 $960 Not Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
IC0093 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,864 $89,448 Not Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
IC0093 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,595 $34,679 Not Implemented
IC0093 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $803 $300 Not Implemented
IC0093 # 07 Y:2004 07 2004 UPGRADE OBSOLETE EQUIPMENT $1,895 $8,597 Not Implemented
OK0696 # 01 Y:2004 01 2004 INSTALL SET-BACK TIMERS $19,051 $4,180 Implemented
OK0696 # 02 Y:2004 02 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,260 $5,950 Implemented
OK0696 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,344 $2,100 Not Implemented
OK0696 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,308 $600 Not Implemented
OK0696 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,876 $559 Implemented
OK0696 # 06 Y:2004 06 2004 PAY BILLS ON TIME TO AVOID LATE FEES $1,545 $0 Implemented
OK0696 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $700 $0 Implemented