Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
133
matching recommendationsNAICS | 337211 | Wood Office Furniture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0772 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,068 | $0 | Not Implemented |
UD0772 # 10 Y:2007 | 10 | 2007 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,744 | $600 | Not Implemented |
UD0772 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,297 | $3,275 | Implemented |
UD0772 # 12 Y:2007 | 12 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $530 | $930 | Not Implemented |
IC0093 # 01 Y:2004 | 01 | 2004 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,168 | $3,600 | Implemented |
IC0093 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,864 | $89,448 | Not Implemented |
IC0093 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,546 | $700 | Implemented |
IC0093 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $737 | $0 | Implemented |
IC0093 # 05 Y:2004 | 05 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,595 | $34,679 | Not Implemented |
IC0093 # 06 Y:2004 | 06 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $803 | $300 | Not Implemented |
IC0093 # 07 Y:2004 | 07 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $1,895 | $8,597 | Not Implemented |
SU0171 # 01 Y:2004 | 01 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,713 | $0 | Implemented |
SU0171 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,485 | $0 | Implemented |
SU0171 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $213 | Implemented |
SU0171 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,759 | $950 | Implemented |
SU0171 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,041 | $7,458 | Implemented |
SU0171 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,145 | $27,936 | Not Implemented |
SU0169 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Implemented |
SU0169 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,040 | $348 | Implemented |
SU0169 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,194 | $26 | Implemented |
SU0169 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $494 | $168 | Implemented |
SU0169 # 05 Y:2003 | 05 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $10,608 | $9,520 | Not Implemented |
SU0169 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,846 | $7,106 | Not Implemented |
TA0055 # 01 Y:2003 | 01 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $68,000 | $0 | Implemented |
TA0055 # 02 Y:2003 | 02 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $36,000 | $31,820 | Implemented |