IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 337215 Showcase, Partition, Shelving, and Locker Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0385 # 05 Y:2008 05 2008 STANDARDIZE MOTOR INVENTORY $6,638 $763 Implemented
WV0385 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,090 $4,000 Not Implemented
WV0385 # 09 Y:2008 09 2008 IMPROVE LUBRICATION PRACTICES $2,864 $2,950 Not Implemented
WV0385 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,198 $81,425 Implemented
WV0385 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,599 $548 Implemented
WV0385 # 14 Y:2008 14 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $324 $50 Not Implemented
WV0385 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $3,100 $140 Implemented
WV0385 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,425 $4,393 Implemented
WV0385 # 13 Y:2008 13 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $527 $100 Implemented
WV0385 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,980 $0 Implemented
WV0385 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,879 $21,600 Not Implemented
WV0385 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,783 $5,000 Not Implemented
WV0385 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,986 $792 Implemented
WV0385 # 12 Y:2008 12 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,167 $925 Not Implemented
WV0336 # 02 Y:2006 02 2006 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $14,092 $25,000 Not Implemented
WV0336 # 09 Y:2006 09 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $320 $0 Not Implemented
WV0336 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $796 $189 Implemented
WV0336 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $2,688 $231 Implemented
WV0336 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,097 $510 Not Implemented
WV0336 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,345 $0 Implemented
WV0336 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,755 $0 Implemented
WV0336 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,454 $1,333 Implemented
WV0336 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,594 $14,968 Implemented
WV0334 # 06 Y:2006 06 2006 REDUCE VENTILATION AIR $3,560 $892 Implemented
WV0334 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,398 $350 Implemented