Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
183
matching recommendationsNAICS | 337215 | Showcase, Partition, Shelving, and Locker Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0500 # 07 Y:2013 | 07 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $577 | $875 | Implemented |
NC0500 # 04 Y:2013 | 04 | 2013 | REDUCE FLUID FLOW RATES | $34,287 | $18,000 | Implemented |
NC0500 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $59,689 | $250,000 | Not Implemented |
NC0500 # 02 Y:2013 | 02 | 2013 | MAKE A NEW BY-PRODUCT | $86,815 | $250,000 | Implemented |
NC0500 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $596 | $1,565 | Not Implemented |
NC0500 # 10 Y:2013 | 10 | 2013 | METER WASTE WATER | $4,155 | $4,200 | Implemented |
NC0500 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,389 | $7,000 | Implemented |
NC0500 # 12 Y:2013 | 12 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,622 | $775 | Implemented |
NC0500 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,558 | $100 | Implemented |
NC0500 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $2,704 | Not Implemented |
NC0500 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $4,146 | $200 | Implemented |
NC0500 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,293 | $125 | Implemented |
NC0500 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $286 | $750 | Not Implemented |
NC0450 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,655 | $98,739 | Implemented |
NC0450 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $973 | Implemented |
NC0450 # 06 Y:2012 | 06 | 2012 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $632 | $2,035 | Not Implemented |
NC0450 # 07 Y:2012 | 07 | 2012 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $113,534 | $25,000 | Implemented |
NC0450 # 09 Y:2012 | 09 | 2012 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $38,389 | $30,000 | Implemented |
NC0450 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,614 | $21,400 | Implemented |
NC0450 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,614 | $9,225 | Not Implemented |
NC0450 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,109 | $100 | Implemented |
NC0450 # 10 Y:2012 | 10 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $4,739 | $8,000 | Not Implemented |
NC0450 # 08 Y:2012 | 08 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $105,000 | $40,000 | Implemented |
SD0507 # 01 Y:2011 | 01 | 2011 | USE PHOTOCELL CONTROLS | $152 | $0 | Implemented |
SD0507 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,615 | $5,000 | Not Implemented |