Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsNAICS | 3379 | Other Furniture Related Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0386 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,011 | $15 | Implemented |
AS0386 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $639 | $1,350 | Implemented |
AS0386 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $205 | $254 | Not Implemented |
AS0386 # 05 Y:2004 | 05 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,680 | $2,000 | Not Implemented |
AS0386 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $437 | $850 | Not Implemented |
AS0386 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,758 | $35,730 | Implemented |
AS0386 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,031 | $120 | Implemented |
WI0463 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,530 | $15,200 | Not Implemented |
WI0463 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,605 | $840 | Not Implemented |
WI0463 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $11,920 | $12,595 | Not Implemented |
WI0463 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,859 | $29,148 | Not Implemented |
WI0463 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,360 | $2,000 | Not Implemented |
WI0463 # 02 Y:2004 | 02 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $17,690 | $17,690 | Not Implemented |
WI0463 # 01 Y:2004 | 01 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $75,927 | $18,500 | Not Implemented |
MS0245 # 08 Y:2004 | 08 | 2004 | DISCONNECT BALLASTS | $93 | $180 | Implemented |
MS0245 # 07 Y:2004 | 07 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $216 | $355 | Not Implemented |
MS0245 # 06 Y:2004 | 06 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,263 | $1,542 | Not Implemented |
MS0245 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,071 | $156 | Implemented |
MS0245 # 04 Y:2004 | 04 | 2004 | USE PHOTOCELL CONTROLS | $3,354 | $1,036 | Not Implemented |
MS0245 # 03 Y:2004 | 03 | 2004 | REPLACE BOILER | $6,523 | $4,642 | Not Implemented |
MS0245 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,496 | $15,583 | Not Implemented |
MS0245 # 01 Y:2004 | 01 | 2004 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $82,017 | $6,780 | Not Implemented |