Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 33792 | Blind and Shade Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0311 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $385 | $476 | Not Implemented |
MS0311 # 06 Y:2007 | 06 | 2007 | BURN WASTE OIL FOR HEAT | $1,265 | $2,186 | Not Implemented |
MS0311 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,304 | $2,700 | Implemented |
MS0311 # 04 Y:2007 | 04 | 2007 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $1,669 | $185 | Not Implemented |
MS0311 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,166 | $176 | Implemented |
MS0311 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,986 | $23,207 | Not Implemented |
MS0311 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,634 | $62,998 | Not Implemented |
LE0248 # 02 Y:2007 | 02 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,118 | $1,600 | Not Implemented |
LE0248 # 08 Y:2007 | 08 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $613 | $20 | Implemented |
LE0248 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $1,531 | $300 | Not Implemented |
LE0248 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,990 | $400 | Implemented |
LE0248 # 05 Y:2007 | 05 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,500 | $2,500 | Implemented |
LE0248 # 04 Y:2007 | 04 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,065 | $11,000 | Implemented |
LE0248 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $5,402 | $2,000 | Not Implemented |
LE0248 # 01 Y:2007 | 01 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $21,600 | $15,000 | Not Implemented |
LE0248 # 09 Y:2007 | 09 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,674 | $25,073 | Implemented |
SD0380 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,495 | $4,550 | Not Implemented |
SD0380 # 05 Y:2006 | 05 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $459 | $3,193 | Not Implemented |
SD0380 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,418 | $2,325 | Not Implemented |
SD0380 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,324 | $220 | Not Implemented |
SD0380 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,026 | $3,850 | Not Implemented |
WI0463 # 01 Y:2004 | 01 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $75,927 | $18,500 | Not Implemented |
WI0463 # 02 Y:2004 | 02 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $17,690 | $17,690 | Not Implemented |
WI0463 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,360 | $2,000 | Not Implemented |
WI0463 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,859 | $29,148 | Not Implemented |