Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,712
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0689 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,151 | $3,917 | n/a |
WV0689 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,571 | $2,065 | n/a |
WV0689 # 01 Y:2025 | 01 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $23,841 | $12,250 | n/a |
WV0689 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,908 | $28,814 | n/a |
WV0689 # 07 Y:2025 | 07 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $962 | $4,680 | n/a |
WV0689 # 02 Y:2025 | 02 | 2025 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,980 | $75,000 | n/a |
WV0689 # 09 Y:2025 | 09 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $826 | $1,390 | n/a |
WV0689 # 11 Y:2025 | 11 | 2025 | INSULATE BARE EQUIPMENT | $234 | $786 | n/a |
WV0689 # 05 Y:2025 | 05 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,146 | $4,200 | n/a |
WV0689 # 10 Y:2025 | 10 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $576 | $700 | n/a |
WV0689 # 08 Y:2025 | 08 | 2025 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $866 | $4,000 | n/a |
TT0334 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,948 | $33,315 | n/a |
TT0334 # 02 Y:2025 | 02 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,793 | $70 | n/a |
TT0334 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,038 | $5,000 | n/a |
TT0334 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,367 | $1,185 | n/a |
TT0334 # 01 Y:2025 | 01 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $10,077 | $0 | n/a |
TT0334 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,719 | $765 | n/a |
TT0334 # 04 Y:2025 | 04 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $6,325 | $21,000 | n/a |
TT0334 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,504 | $60 | n/a |
TT0334 # 09 Y:2025 | 09 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $303 | $435 | n/a |
MS0447 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $144,047 | $116,128 | n/a |
MS0447 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $56,915 | $6,958 | n/a |
MS0447 # 06 Y:2025 | 06 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $2,030,279 | $11,484,200 | n/a |
MS0447 # 02 Y:2025 | 02 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $80,000 | $30,005 | n/a |
MS0447 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $668,474 | $6,707,386 | n/a |