Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,640
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1101 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,750 | $7,500 | n/a |
MI0454 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,818 | $0 | n/a |
UD1101 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,622 | $4,975 | n/a |
MI0454 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,560 | $7,300 | n/a |
MI0454 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $31,534 | $960 | n/a |
MI0454 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,118 | $11,168 | n/a |
MI0454 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $22,309 | $111,252 | n/a |
UD1101 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $430 | $1,040 | n/a |
UD1101 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $952 | n/a |
MI0454 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,625 | $364,596 | n/a |
UD1101 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,015 | n/a |
UD1101 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,997 | $6,792 | n/a |
UD1101 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,284 | $0 | n/a |
UD1101 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $94 | $0 | n/a |
UD1101 # 09 Y:2025 | 09 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $1,350 | n/a |
UD1101 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,143 | $0 | n/a |
UD1101 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,101 | $4,400 | n/a |
MI0454 # 05 Y:2024 | 05 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $905 | $4,156 | n/a |
SU0566 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,143 | $386,971 | n/a |
SU0566 # 03 Y:2024 | 03 | 2024 | INSTALL BACK-UP EQUIPMENT | $146,250 | $86,000 | n/a |
SU0566 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,092 | $3,600 | n/a |
SU0566 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $1,117 | $5,009 | n/a |
SU0566 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,092 | $0 | n/a |
SU0566 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,167 | $12,180 | n/a |
SU0566 # 02 Y:2024 | 02 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,316 | $114 | n/a |