IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,127

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0743 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,625 $0 Implemented
OR0743 # 02 Y:2021 02 2021 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,808 $8,548 Implemented
OR0743 # 03 Y:2021 03 2021 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $29,553 $281,475 Implemented
AM0827 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $13,390 $30,920 Implemented
AM0827 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,760 $1,300 Implemented
AM0827 # 03 Y:2021 03 2021 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,630 $0 Implemented
AM0827 # 04 Y:2021 04 2021 PAY UTILITY BILLS ON TIME $1,766 $0 Implemented
MA0825 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $93,702 $30,000 Implemented
MA0825 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $54,067 $150,000 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented
MA0825 # 05 Y:2021 05 2021 MINIMIZE WATER USAGE $24,897 $6,250 Implemented
OK1051 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,640 $7,393 Implemented
OK1051 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,614 $677 Implemented
MI0388 # 03 Y:2021 03 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,022 $38,081 Implemented
MI0388 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $31,640 $80 Implemented
MI0388 # 05 Y:2021 05 2021 REPAIR OR REPLACE STEAM TRAPS $13,798 $4,080 Implemented
OK1050 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,760 $900 Implemented
IP0146 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $469 $0 Implemented
IP0146 # 02 Y:2021 02 2021 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $7,392 $260 Implemented
IP0146 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,150 $50 Implemented
IP0146 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,959 $3,259 Implemented
IP0146 # 05 Y:2021 05 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $588 $1,028 Implemented
IP0146 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $135 $275 Implemented
MI0385 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,589 $6,672 Implemented
MI0385 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented