Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
114
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0199 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,884 | $378 | Not Implemented |
UU0199 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,575 | Implemented |
UU0199 # 05 Y:2022 | 05 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $200 | $564 | Not Implemented |
UU0167 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $471,950 | $2,795,000 | Not Implemented |
UU0167 # 02 Y:2020 | 02 | 2020 | TREAT AND REUSE RINSE WATERS | $72,249 | $60,000 | Implemented |
UU0167 # 03 Y:2020 | 03 | 2020 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $35,350 | $180,000 | Implemented |
UU0167 # 04 Y:2020 | 04 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,331 | $22,500 | Not Implemented |
UU0167 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,178 | $17,274 | Implemented |
UU0144 # 01 Y:2019 | 01 | 2019 | INSULATE BARE EQUIPMENT | $42,296 | $1,068 | Implemented |
UU0144 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $16,349 | $400 | Implemented |
UU0144 # 03 Y:2019 | 03 | 2019 | OPTIMIZE PLANT POWER FACTOR | $6,190 | $6,000 | Not Implemented |
UU0144 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,420 | $128 | Implemented |
UU0128 # 01 Y:2018 | 01 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $109,419 | $1,693 | Implemented |
UU0128 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $80,946 | $500 | Implemented |
UU0128 # 03 Y:2018 | 03 | 2018 | ADD AREA LIGHTING SWITCHES | $1,227 | $2,200 | Implemented |
UU0128 # 04 Y:2018 | 04 | 2018 | DISCONNECT BALLASTS | $958 | $800 | Not Implemented |
UU0128 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $829 | $0 | Implemented |
UU0118 # 01 Y:2017 | 01 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,592 | $500 | Not Implemented |
UU0118 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $7,381 | $0 | Implemented |
UU0118 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,762 | $0 | Not Implemented |
UU0118 # 04 Y:2017 | 04 | 2017 | INSTALL SPECTRAL REFLECTORS / DELAMP | $361 | $113 | Not Implemented |
UU0116 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,863 | $0 | Implemented |
UU0116 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $6,759 | $0 | Not Implemented |
UU0116 # 03 Y:2017 | 03 | 2017 | REDUCE VENTILATION AIR | $61,065 | $0 | Not Implemented |
UU0116 # 04 Y:2017 | 04 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,620 | $580 | Not Implemented |