IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0276 # 05 Y:2023 05 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,613 $1,169 n/a
UA0276 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,760 $35,064 n/a
UA0276 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,956 $1,000 n/a
UA0276 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,633 $8,591 n/a
UA0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,109 $57,867 n/a
UA0271 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $925 $377 n/a
UA0271 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,935 $24,359 n/a
UA0271 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $66,296 $2,275 n/a
UA0271 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,447 $13,906 n/a
UA0271 # 05 Y:2023 05 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $122 $65 n/a
UA0191 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,997 $0 Implemented
UA0191 # 01 Y:2018 01 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,889 $37,420 Not Implemented
UA0191 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,092 $2,256 Not Implemented
UA0191 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $489 $2,112 Not Implemented
UA0191 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,391 $150 Not Implemented
UA0191 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,060 $34,939 Not Implemented
UA0191 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $15,914 $0 Implemented
UA0191 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,326 $2,165 Implemented
UA0083 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $806 $480 Not Implemented
UA0083 # 07 Y:2012 07 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,356 $2,344 Not Implemented
UA0083 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $244 $634 Not Implemented
UA0083 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $1,585 $3,212 Not Implemented
UA0083 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,259 $39,310 Implemented
UA0083 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,058 $2,513 Not Implemented
UA0083 # 08 Y:2012 08 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $702 $386 Not Implemented