IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0209 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,279 $1,600 Implemented
UU0209 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $900 Implemented
UU0209 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,395 Implemented
UU0209 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,206 $5,920 Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
UU0201 # 02 Y:2022 02 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,352 $8,000 Implemented
UU0201 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $730 $500 Implemented
UU0201 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,786 $1,000 Implemented
UU0201 # 01 Y:2022 01 2022 USE POWER DURING OFF-PEAK PERIODS $19,186 $1,125 Implemented
UU0199 # 01 Y:2022 01 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,239 $4,868 Implemented
UU0199 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,264 $2,575 Implemented
UU0167 # 03 Y:2020 03 2020 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $35,350 $180,000 Implemented
UU0167 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,178 $17,274 Implemented
UU0167 # 02 Y:2020 02 2020 TREAT AND REUSE RINSE WATERS $72,249 $60,000 Implemented
UU0144 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $42,296 $1,068 Implemented
UU0144 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,349 $400 Implemented
UU0144 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,420 $128 Implemented
UU0128 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $829 $0 Implemented
UU0128 # 03 Y:2018 03 2018 ADD AREA LIGHTING SWITCHES $1,227 $2,200 Implemented
UU0128 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $80,946 $500 Implemented
UU0128 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $109,419 $1,693 Implemented
UU0118 # 02 Y:2017 02 2017 USE OPTIMUM TEMPERATURE $7,381 $0 Implemented
UU0116 # 06 Y:2017 06 2017 INSTALL SPECTRAL REFLECTORS / DELAMP $901 $142 Implemented
UU0116 # 08 Y:2017 08 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $59,018 $500 Implemented
UU0116 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,863 $0 Implemented