Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,264
matching recommendationsNAICS | 3391 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0463 # 01 Y:2004 | 01 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $23,300 | $19,700 | Implemented |
AM0463 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $18,200 | $16,600 | Implemented |
AM0463 # 03 Y:2004 | 03 | 2004 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $14,500 | $7,550 | Not Implemented |
AM0463 # 04 Y:2004 | 04 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,100 | $0 | Implemented |
AM0463 # 05 Y:2004 | 05 | 2004 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,475 | $0 | Implemented |
AM0463 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,470 | $20 | Not Implemented |
AM0463 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,450 | $730 | Implemented |
AM0463 # 08 Y:2004 | 08 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,030 | $400 | Implemented |
SD0339 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,112 | $320 | Implemented |
SD0339 # 02 Y:2004 | 02 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,250 | $2,570 | Not Implemented |
SD0339 # 03 Y:2004 | 03 | 2004 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,831 | $0 | Implemented |
SD0339 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $477 | $1,700 | Not Implemented |
SD0339 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,362 | $10,000 | n/a |
SD0325 # 01 Y:2003 | 01 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $88,041 | $300,075 | Not Implemented |
SD0325 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $71,754 | $0 | Implemented |
SD0325 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,956 | $32,725 | Implemented |
SD0325 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $37,849 | $2,000 | Implemented |
SD0325 # 05 Y:2003 | 05 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $36,071 | $1,000 | Implemented |
SD0325 # 06 Y:2003 | 06 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $14,542 | $0 | Not Implemented |
SD0325 # 07 Y:2003 | 07 | 2003 | INSTALL SKYLIGHTS | $9,297 | $18,000 | Not Implemented |
SD0325 # 08 Y:2003 | 08 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,279 | $1,410 | Not Implemented |
LE0156 # 01 Y:2003 | 01 | 2003 | SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE | $1,112 | $870 | Implemented |
LE0156 # 02 Y:2003 | 02 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,320 | $750 | Not Implemented |
LE0156 # 03 Y:2003 | 03 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,466 | $0 | Not Implemented |
LE0156 # 04 Y:2003 | 04 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,340 | $0 | Implemented |