IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,223

matching recommendations
Reset
NAICS 33911 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0650 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,735 $0 Implemented
MA0650 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $581 $2,300 Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented
MA0650 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $0 Implemented
UF0419 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,890 $904 Not Implemented
UF0419 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,358 $0 Not Implemented
UF0419 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,291 $0 Not Implemented
UF0419 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented
UF0419 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $2,671 $3,405 Not Implemented
UF0419 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $32,995 $9,325 Not Implemented
UF0419 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $112,051 $1,026 Not Implemented
UF0419 # 08 Y:2009 08 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $107,292 $42,500 Not Implemented
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
UA0024 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,342 $0 Implemented
UA0024 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $1,500 Implemented
UA0024 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $14,155 Not Implemented
UA0024 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $1,392 $243 Implemented
UA0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,203 $300 Implemented
UA0024 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,555 $2,415 Implemented
UA0024 # 07 Y:2008 07 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $98,000 $126,000 Not Implemented
UA0024 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,566 $23,000 Not Implemented
UA0024 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $42,744 $45,700 Not Implemented
GT0850 # 01 Y:2008 01 2008 COMBINE UTILITY METERS $2,910 $0 Not Implemented
GT0850 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,172 $10,000 Implemented