matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0260 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $726 | $3,000 | n/a |
UU0260 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,696 | $8,277 | n/a |
UU0260 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $489 | $1,818 | n/a |
UU0260 # 02 Y:2024 | 02 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,585 | $5,800 | n/a |
UU0260 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $27,825 | $247,680 | n/a |
UU0260 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,557 | $6,277 | n/a |
UU0231 # 01 Y:2023 | 01 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $19,636 | $127,500 | Not Implemented |
UU0231 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,898 | $263,547 | Implemented |
UU0231 # 04 Y:2023 | 04 | 2023 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,026 | $30,128 | Not Implemented |
UU0231 # 03 Y:2023 | 03 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $6,518 | $19,160 | Implemented |
UU0231 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,519 | $14,890 | Implemented |
UU0209 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,311 | $900 | Implemented |
UU0209 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,279 | $1,600 | Implemented |
UU0209 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,593 | $20,930 | Not Implemented |
UU0209 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,206 | $5,920 | Implemented |
UU0209 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,247 | $850 | Not Implemented |
UU0209 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,767 | $6,406 | Not Implemented |
UU0209 # 05 Y:2022 | 05 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,347 | $1,395 | Implemented |
UU0201 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,786 | $1,000 | Implemented |
UU0201 # 06 Y:2022 | 06 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $307 | $329 | Not Implemented |
UU0201 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $730 | $500 | Implemented |
UU0201 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,352 | $8,000 | Implemented |
UU0201 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $771 | $1,550 | Not Implemented |
UU0201 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $19,186 | $1,125 | Implemented |
UU0199 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,239 | $4,868 | Implemented |