Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
733
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0457 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $525 | $840 | Not Implemented |
IA0457 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $691 | $752 | Implemented |
IA0457 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,163 | $70 | Implemented |
IA0457 # 09 Y:2010 | 09 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,214 | $2,400 | Implemented |
IA0457 # 10 Y:2010 | 10 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $428 | $579 | Implemented |
IA0457 # 11 Y:2010 | 11 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,841 | $1,000 | Not Implemented |
DL0058 # 01 Y:2010 | 01 | 2010 | REDUCE VENTILATION AIR | $152,300 | $500,000 | Not Implemented |
DL0058 # 02 Y:2010 | 02 | 2010 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $95,200 | $250,000 | Not Implemented |
DL0058 # 03 Y:2010 | 03 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $143,000 | $4,268 | Implemented |
DL0058 # 04 Y:2010 | 04 | 2010 | DISCONNECT BALLASTS | $12,500 | $350 | Not Implemented |
DL0058 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,800 | $250 | Implemented |
DL0058 # 06 Y:2010 | 06 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,400 | $100 | Not Implemented |
DL0058 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,080 | $6,300 | Not Implemented |
DL0058 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,000 | $7,644 | Implemented |
DL0058 # 09 Y:2010 | 09 | 2010 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,200 | $10,000 | Not Implemented |
DL0058 # 10 Y:2010 | 10 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,110 | $18,280 | Not Implemented |
DL0058 # 11 Y:2010 | 11 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,215 | $2,500 | Not Implemented |
DL0058 # 12 Y:2010 | 12 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,140 | $5,050 | Not Implemented |
UD0821 # 01 Y:2010 | 01 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,575 | $300,000 | Implemented |
UD0821 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,610 | $25 | Implemented |
UD0821 # 03 Y:2010 | 03 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,331 | $75 | Not Implemented |
UD0821 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,341 | $60,300 | Implemented |
UD0821 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $479 | $893 | Implemented |
UD0821 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,023 | $4,000 | Not Implemented |
UD0821 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,766 | $25 | Not Implemented |