IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0604 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,457 $280 Implemented
SF0604 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $65,157 $47,904 Not Implemented
SF0604 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $33,778 $1,120 Not Implemented
SF0604 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,745 $1,883 Not Implemented
SF0604 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,142 $8,611 Not Implemented
SF0604 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,264 $2,879 Not Implemented
SD0638 # 13 Y:2023 13 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $98,322 $418,100 Implemented
SD0638 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,358 $4,547 Not Implemented
SD0638 # 11 Y:2023 11 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,174 $306 Implemented
SD0638 # 12 Y:2023 12 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,093 $0 Not Implemented
SD0638 # 14 Y:2023 14 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,732 $1,488 Not Implemented
SD0638 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $816 $799 Not Implemented
SD0638 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $47,916 $0 Not Implemented
SD0638 # 10 Y:2023 10 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,339 $5,400 Not Implemented
SD0638 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $208,310 $270,000 Not Implemented
SD0638 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $500 Implemented
SD0638 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $59,928 $104,792 Not Implemented
SD0638 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,975 $46,984 Not Implemented
SD0638 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,403 $3,320 Not Implemented
SD0638 # 03 Y:2023 03 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $161 $250 Implemented
SF0565 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $294 $90 Not Implemented
SF0565 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $603 $135 Not Implemented
SF0565 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,819 $622 Implemented
SF0565 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,884 $1,122 Not Implemented
SF0565 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $770 $0 Not Implemented