Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsNAICS | 339113 | Surgical Appliance and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0584 # 10 Y:2022 | 10 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $68,493 | $0 | Implemented |
UF0584 # 09 Y:2022 | 09 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $68,739 | $10,000 | Not Implemented |
UF0584 # 04 Y:2022 | 04 | 2022 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $56,623 | $65,000 | Not Implemented |
UF0584 # 08 Y:2022 | 08 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,261 | $3,420 | Not Implemented |
UF0584 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,855 | $40,432 | Implemented |
UF0584 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $57,843 | $55,197 | Not Implemented |
UF0584 # 06 Y:2022 | 06 | 2022 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $10,226 | $7,600 | Not Implemented |
UF0584 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,250 | $160 | Not Implemented |
UF0584 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $73,209 | $322,608 | Not Implemented |
UF0584 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $544,931 | $1,699,000 | Not Implemented |
MI0343 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,500 | $3,280 | Implemented |
MI0343 # 09 Y:2018 | 09 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,896 | $6,486 | Implemented |
MI0343 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,044 | $2,973 | Not Implemented |
MI0343 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,552 | $7,675 | Implemented |
MI0343 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,421 | $1,005 | Not Implemented |
MI0343 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,079 | $2,030 | Implemented |
MI0343 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,400 | $71,328 | Implemented |
MI0343 # 02 Y:2018 | 02 | 2018 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $37,140 | $43,838 | Not Implemented |
MI0343 # 01 Y:2018 | 01 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $236,442 | $800,000 | Implemented |
UF0518 # 06 Y:2018 | 06 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,000 | $41,200 | Implemented |
UF0518 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,145 | $9,600 | Implemented |
UF0518 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,401 | $0 | Implemented |
UF0518 # 02 Y:2018 | 02 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,684 | $1,980 | Implemented |
UF0518 # 03 Y:2018 | 03 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,844 | $586 | Implemented |
UF0518 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,028 | $167,216 | Implemented |