IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0073 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,080 $860 Not Implemented
UU0073 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,250 $8,000 Not Implemented
UU0073 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,700 $2,500 Not Implemented
UU0073 # 06 Y:2004 06 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,500 $15,000 Not Implemented
UU0073 # 07 Y:2004 07 2004 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $130 $0 Not Implemented
UU0073 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $990 $6,000 Not Implemented
UU0073 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,434 $0 Not Implemented
UD0708 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,091 $0 Not Implemented
UD0708 # 12 Y:2004 12 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,677 $5,152 Not Implemented
UD0708 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,678 $10,931 Implemented
UD0708 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,586 $0 Implemented
UD0708 # 13 Y:2004 13 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,344 $0 Not Implemented
UD0708 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,451 $0 Implemented
UD0708 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,364 $20,952 Implemented
UD0708 # 10 Y:2004 10 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,013 $780 Not Implemented
UD0708 # 01 Y:2004 01 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $625,410 $325,000 Not Implemented
UD0708 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,575 $35,400 Not Implemented
UD0708 # 02 Y:2004 02 2004 DISCONNECT BALLASTS $53,161 $3,105 Implemented
UD0708 # 14 Y:2004 14 2004 INSULATE BARE EQUIPMENT $2,927 $986 Not Implemented
UD0708 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,459 $3,900 Implemented
UD0708 # 05 Y:2004 05 2004 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $39,175 $120,100 Implemented
UU0070 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $70,000 $18,000 Implemented
UU0070 # 04 Y:2004 04 2004 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $73,401 $750,000 Implemented
UU0070 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $16,729 $26,520 Not Implemented
UU0070 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95,199 $0 Implemented