IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0032 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $659 $556 Implemented
IP0032 # 03 Y:2014 03 2014 USE SOLAR HEAT TO HEAT WATER $69,019 $314,300 Not Implemented
IP0032 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,263 $0 Implemented
IP0030 # 01 Y:2014 01 2014 INSTALL SET-BACK TIMERS $4,377 $35 Implemented
IP0030 # 02 Y:2014 02 2014 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,730 $124 Implemented
IP0030 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,493 $280 Implemented
IP0030 # 04 Y:2014 04 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,369 $746 Not Implemented
IP0030 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $442 $227 Implemented
IP0030 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $685 $380 Not Implemented
IP0030 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,951 $1,300 Not Implemented
IP0030 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $406 $1,181 Not Implemented
IP0030 # 09 Y:2014 09 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,765 $116,486 Not Implemented
WV0485 # 01 Y:2014 01 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,434 $1,000 Not Implemented
WV0485 # 02 Y:2014 02 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,166 $12,500 Not Implemented
WV0485 # 03 Y:2014 03 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,371 $10,550 Not Implemented
WV0485 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,211 $2,981 Implemented
WV0485 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,703 $500 Implemented
WV0485 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,806 $4,815 Not Implemented
WV0485 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $175 Implemented
WV0485 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,805 $3,000 Implemented
WV0485 # 09 Y:2014 09 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,922 $1,719 Not Implemented
WV0485 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,433 Not Implemented
WV0485 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,516 $696 Implemented
WV0485 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $426 Implemented
TT0120 # 01 Y:2013 01 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,400 $85 Implemented