IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0734 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $2,141 $3,500 Not Implemented
UD0734 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,798 $8,041 Implemented
UD0734 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Not Implemented
UD0734 # 09 Y:2006 09 2006 REDUCE VENTILATION AIR $750 $0 Implemented
UD0734 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $477 $275 Implemented
UD0734 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $53 Implemented
SD0376 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,522 $143,750 Not Implemented
SD0376 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,390 $43,125 Not Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,062 $31,291 Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,516 $12,616 Not Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented
SU0221 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,043 $0 Implemented
SU0221 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $1,767 $0 Implemented
SU0221 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,455 $0 Implemented
SU0221 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $0 Implemented
SU0221 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,835 $444 Not Implemented
SU0221 # 06 Y:2005 06 2005 INSTALL TURBULATORS $1,056 $271 Not Implemented
SU0221 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,388 $2,015 Implemented
SU0221 # 08 Y:2005 08 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,125 $5,000 Not Implemented
SU0221 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $129 $1,155 Implemented
SU0221 # 10 Y:2005 10 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $259 $721 Implemented
SU0221 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $96 $391 Implemented
UD0730 # 01 Y:2005 01 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,357 $3,600 Not Implemented