IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0281 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $450 Not Implemented
BD0281 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $300 Not Implemented
BD0281 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $903 $1,320 Not Implemented
BD0282 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $14,504 $9,200 Not Implemented
BD0282 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,913 $12,000 Not Implemented
BD0282 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,962 $3,545 Not Implemented
BD0282 # 04 Y:2005 04 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,896 $15,000 Not Implemented
BD0282 # 05 Y:2005 05 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,787 $5,000 Not Implemented
BD0282 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,439 $3,200 Not Implemented
BD0282 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,696 $375 Not Implemented
BD0282 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,494 $3,200 Not Implemented
BD0282 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Not Implemented
BD0282 # 10 Y:2005 10 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $212 $450 Not Implemented
SU0199 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $144 $0 Implemented
SU0199 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,830 $0 Not Implemented
SU0199 # 03 Y:2005 03 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $371,280 $13,500 Implemented
SU0199 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $11,792 $1,184 Not Implemented
SU0199 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $7,434 $2,000 Implemented
UD0708 # 01 Y:2004 01 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $625,410 $325,000 Not Implemented
UD0708 # 02 Y:2004 02 2004 DISCONNECT BALLASTS $53,161 $3,105 Implemented
UD0708 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $45,575 $35,400 Not Implemented
UD0708 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,459 $3,900 Implemented
UD0708 # 05 Y:2004 05 2004 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $39,175 $120,100 Implemented
UD0708 # 06 Y:2004 06 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $22,586 $0 Implemented
UD0708 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $20,091 $0 Not Implemented