IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0164 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $803 Implemented
IP0164 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $972 $1,279 Implemented
IP0164 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,709 $1,228 Implemented
IP0164 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $1,271 Implemented
IP0164 # 03 Y:2022 03 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,643 $1,028 Not Implemented
IP0164 # 02 Y:2022 02 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,853 $2,064 Not Implemented
IP0164 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,649 $1,428 Implemented
LE0535 # 06 Y:2022 06 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $75,870 $448,000 Not Implemented
LE0535 # 05 Y:2022 05 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $44,811 $140,000 Not Implemented
LE0535 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $246,141 $750,000 Not Implemented
LE0535 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,728 $2,200 Not Implemented
LE0535 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $684 $780 Not Implemented
LE0535 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,826 $6,362 Not Implemented
UU0204 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $45,240 $17,600 Not Implemented
UU0204 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,275 $12,600 Not Implemented
UU0204 # 03 Y:2022 03 2022 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,674 $25,650 Not Implemented
UU0204 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,347 $5,215 Not Implemented
UU0204 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $4,414 $1,000 Not Implemented
UU0204 # 06 Y:2022 06 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,228 $2,448 Not Implemented
UU0204 # 07 Y:2022 07 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,552 $4,497 Not Implemented
UU0204 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,260 $3,781 Not Implemented
UU0204 # 09 Y:2022 09 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,637 $1,536 Not Implemented
UU0204 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $900 Not Implemented
OK1069 # 05 Y:2022 05 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,394 $1,540 Implemented
OK1069 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $156 $488 Implemented