IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1069 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $612 $304 Implemented
OK1069 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,879 $0 Implemented
OK1069 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,392 $27,027 Implemented
WM0175 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $840,840 $38,534 Not Implemented
WM0175 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,473 $0 Not Implemented
WM0175 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98,046 $48,230 Not Implemented
WM0175 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,088 $85,000 Not Implemented
WM0175 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $447,150 $2,178,400 Not Implemented
WM0175 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $941,741 $1,060,000 Not Implemented
IC0251 # 01 Y:2021 01 2021 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $83,331 $171,790 Not Implemented
IC0251 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,466 $1,457 Not Implemented
IC0251 # 03 Y:2021 03 2021 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $4,596 $2,567 Not Implemented
WM0170 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $216 $260 Implemented
WM0170 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $182 Implemented
WM0170 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $598 $880 Not Implemented
WM0170 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,828 $1,500 Not Implemented
WM0170 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,851 $3,500 Implemented
WM0170 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,204 $875 Not Implemented
WM0170 # 02 Y:2021 02 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $4,328 $3,000 Implemented
WM0170 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,931 $24,300 Implemented
AM0833 # 08 Y:2022 08 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,873 $930 Implemented
AM0833 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $390 $15 Implemented
AM0833 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $529 Implemented
AM0833 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $457 $410 Implemented
AM0833 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $1,930 Not Implemented