Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsNAICS | 33999 | All Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0708 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,364 | $20,952 | Implemented |
UD0708 # 12 Y:2004 | 12 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,677 | $5,152 | Not Implemented |
UD0708 # 01 Y:2004 | 01 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $625,410 | $325,000 | Not Implemented |
UD0708 # 02 Y:2004 | 02 | 2004 | DISCONNECT BALLASTS | $53,161 | $3,105 | Implemented |
UD0708 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $45,575 | $35,400 | Not Implemented |
UD0708 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,678 | $10,931 | Implemented |
UD0708 # 09 Y:2004 | 09 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,451 | $0 | Implemented |
UD0708 # 13 Y:2004 | 13 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,344 | $0 | Not Implemented |
UD0708 # 10 Y:2004 | 10 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,013 | $780 | Not Implemented |
UD0708 # 14 Y:2004 | 14 | 2004 | INSULATE BARE EQUIPMENT | $2,927 | $986 | Not Implemented |
UD0708 # 07 Y:2004 | 07 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,091 | $0 | Not Implemented |
UD0708 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,459 | $3,900 | Implemented |
UD0708 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,586 | $0 | Implemented |
UD0708 # 05 Y:2004 | 05 | 2004 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $39,175 | $120,100 | Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $16,729 | $26,520 | Not Implemented |
UU0070 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,370,474 | $22,000,000 | Not Implemented |
UM0267 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,119 | $1,300 | Not Implemented |
UM0267 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,390 | $200 | Not Implemented |
UM0267 # 08 Y:2004 | 08 | 2004 | USE OPTIMUM THICKNESS INSULATION | $3,274 | $1,985 | Not Implemented |
UM0267 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $711 | $736 | Not Implemented |
UM0267 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,938 | $2,615 | Implemented |
UM0267 # 02 Y:2004 | 02 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,684 | $2,400 | Not Implemented |