IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 33999 All Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0558 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $1,595 Implemented
NC0558 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145 $716 Implemented
NC0558 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $372 Implemented
NC0558 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $296 $80 Implemented
NC0558 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,031 $227 Implemented
NC0558 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,599 $250,000 Not Implemented
NC0558 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44 $120 Not Implemented
NC0558 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $28,923 $17,820 Not Implemented
NC0558 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,925 $300 Implemented
NC0558 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $16,078 $5,000 Implemented
NC0558 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,981 $1,000 Not Implemented
NC0558 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,947 $6,425 Implemented
IA0541 # 03 Y:2015 03 2015 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,245 $6,960 Not Implemented
IA0541 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,686 $214 Implemented
IA0541 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,167 $470 Not Implemented
IA0541 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,920 $20,600 Not Implemented
IA0541 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $4,110 $5,543 Not Implemented
IA0541 # 05 Y:2015 05 2015 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,909 $1,547 Not Implemented
IA0541 # 09 Y:2015 09 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $602 $280 Implemented
IA0541 # 11 Y:2015 11 2015 DIRECT WARMEST AIR TO COMBUSTION INTAKE $328 $212 Not Implemented
IA0541 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,690 $4,712 Implemented
IA0541 # 08 Y:2015 08 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,121 $175 Not Implemented
IA0541 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $980 Implemented
IP0040 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $896 $212 Not Implemented
IP0040 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $8 Not Implemented