Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsNAICS | 423 | Merchant Wholesalers, Durable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0671 # 04 Y:2025 | 04 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $14,911 | $23,188 | n/a |
SD0671 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $2,541 | $1,352 | n/a |
SD0671 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,404 | $0 | n/a |
SD0671 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,797 | $103,994 | n/a |
SD0671 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,033 | $9,226 | n/a |
SD0671 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,996 | $0 | n/a |
NT0025 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,914 | $5,609 | Implemented |
NT0025 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,511 | $906 | Not Implemented |
NT0025 # 04 Y:2024 | 04 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,410 | $21,995 | Implemented |
NT0025 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,643 | $1,302 | Not Implemented |
NT0025 # 06 Y:2024 | 06 | 2024 | CHANGE OPERATING CONDITIONS | $150,000 | $1,200,000 | Implemented |
NT0025 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,136 | $0 | Implemented |
LE0563 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $1,600 | n/a |
LE0563 # 07 Y:2024 | 07 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,253 | $9,000 | n/a |
LE0563 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,361 | $21,000 | n/a |
LE0563 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,800 | $19,440 | n/a |
LE0563 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,106 | $2,500 | n/a |
LE0563 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $307 | $140 | n/a |
LE0563 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,648 | $960 | n/a |
LE0563 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $474 | $100 | n/a |
UD1077 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,384 | $78,400 | Not Implemented |
UD1077 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $145 | $550 | Not Implemented |
UD1077 # 02 Y:2024 | 02 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,002 | $25,200 | Implemented |
UD1077 # 01 Y:2024 | 01 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,038 | $5,500 | Not Implemented |
IP0181 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $18 | Not Implemented |