Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
24
matching recommendationsNAICS | 541712 | Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0411 # 01 Y:2016 | 01 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,414 | $0 | Implemented |
SU0411 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $3,422 | $10,350 | Implemented |
SU0411 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,158 | $1,449 | Implemented |
SU0411 # 04 Y:2016 | 04 | 2016 | ELIMINATE/REDUCE AN OPERATION | $3,627 | $6,660 | Implemented |
SU0411 # 05 Y:2016 | 05 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $167 | $235 | Implemented |
SU0411 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,579 | $45,826 | Not Implemented |
WM0054 # 08 Y:2014 | 08 | 2014 | MINIMIZE WATER USAGE | $1,764 | $6,315 | Not Implemented |
WM0054 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $720 | Implemented |
WM0054 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,194 | $4,048 | Not Implemented |
WM0054 # 05 Y:2014 | 05 | 2014 | USE SOLAR HEAT TO MAKE ELECTRICTY | $934 | $0 | Implemented |
WM0054 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $2,363 | $2,000 | Not Implemented |
WM0054 # 03 Y:2014 | 03 | 2014 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,335 | $10,000 | Not Implemented |
WM0054 # 02 Y:2014 | 02 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,524 | $330 | Implemented |
WM0054 # 01 Y:2014 | 01 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,511 | $0 | Implemented |
UM0421 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $494 | $3,525 | Implemented |
UM0421 # 03 Y:2013 | 03 | 2013 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,857 | $4,000 | Not Implemented |
UM0421 # 01 Y:2013 | 01 | 2013 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $75,276 | $110,000 | Not Implemented |
SD0378 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,312 | $6,160 | Implemented |
SD0378 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $2,957 | $384 | Implemented |
SD0378 # 05 Y:2006 | 05 | 2006 | USE MINIMUM STEAM OPERATING PRESSURE | $1,208 | $0 | Implemented |
SD0378 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,124 | $15,000 | Implemented |
SD0378 # 03 Y:2006 | 03 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $16,633 | $0 | Implemented |
SD0378 # 02 Y:2006 | 02 | 2006 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $27,521 | $0 | Not Implemented |
SD0378 # 01 Y:2006 | 01 | 2006 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $170,338 | $792,300 | Not Implemented |