IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
NAICS 5622 Waste Treatment and Disposal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2004 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,961 $27,670 Implemented
CL2004 # 02 Y:2020 02 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,699 $350,000 Implemented
CL2004 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,256 $196,000 Implemented
CL2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,753 $16,667 Implemented
CL2002 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $70,362 $136,200 Implemented
CL2002 # 03 Y:2020 03 2020 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $49,183 $300,000 Implemented
SF0490 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,446 $90 Implemented
SF0490 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,188 $0 Implemented
SF0490 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,291 $2,526 Implemented
SF0490 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,873 $39,842 Implemented
SF0490 # 05 Y:2016 05 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $86,200 $179,607 Implemented
SF0490 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $883 $3,334 Implemented
LL0331 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,741 $2,100 Not Implemented
LL0331 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $323,997 $61,880 Implemented
LL0331 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $523 $546 Not Implemented
LL0331 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $923 $530 Not Implemented
LL0331 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,590 $1,250 Not Implemented
LL0331 # 02 Y:2010 02 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,477 $1,200 Implemented
LL0330 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $132,650 $40,600 Implemented
LL0330 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $100 $120 Not Implemented
LL0330 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $254 $1,855 Not Implemented
LL0330 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $389 $335 Not Implemented
LL0330 # 04 Y:2010 04 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $612 $934 Not Implemented
LL0330 # 03 Y:2010 03 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,865 $750 Implemented
LL0330 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $138,978 $13,140 Implemented