IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 81233 Linen and Uniform Supply
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0224 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $25 Implemented
LS0224 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,962 $75 Implemented
LS0224 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $1,413 Implemented
LS0224 # 05 Y:2024 05 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $175,678 $600,000 Implemented
WV0551 # 11 Y:2017 11 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $33 Implemented
WV0551 # 08 Y:2017 08 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $447 $1,000 Implemented
WV0551 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $866 $595 Implemented
WV0551 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,417 $1,346 Implemented
WV0551 # 04 Y:2017 04 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,726 $1,000 Implemented
WV0551 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,421 $14,500 Implemented
MA0730 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,618 $4,285 Implemented
MA0730 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $478 $300 Implemented
MA0730 # 03 Y:2014 03 2014 REDUCE VENTILATION AIR $1,607 $4,600 Implemented
DL0117 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $60,922 $5,695 Implemented
DL0117 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $23,476 $5,870 Implemented
OR0492 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $2,200 $10,000 Implemented
OR0492 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,984 $7,300 Implemented
OR0492 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,568 $6,500 Implemented
OR0492 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,130 $0 Implemented
OR0492 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,600 $1,800 Implemented
OR0492 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $96,200 $30,000 Implemented
OR0480 # 01 Y:2005 01 2005 METER WASTE WATER $14,400 $0 Implemented
OR0480 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $3,200 Implemented
OR0480 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $493 $0 Implemented