IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 10 Mining
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
UU0193 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $946 $3,500 Not Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0145 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $373,488 $10,000 Not Implemented
UU0145 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $661 $440 Implemented
UU0145 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $4,719 Implemented
UU0145 # 05 Y:2019 05 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $25,041 $5,000 Not Implemented
UU0145 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $47,010 $23,850 Not Implemented
UU0145 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,566 $36,000 Implemented
UU0145 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $377,567 $872,000 Not Implemented
OR0424 # 09 Y:2002 09 2002 $14,715 $45,000 Not Implemented
OR0424 # 03 Y:2002 03 2002 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $158,150 $118,500 n/a
OR0424 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $958,574 $1,727,000 Not Implemented
OR0424 # 01 Y:2002 01 2002 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $577,590 $207,147 n/a
OR0424 # 05 Y:2002 05 2002 $69,350 $46,000 Implemented
OR0424 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,349 $0 Not Implemented
OR0424 # 07 Y:2002 07 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $20,311 $1,000 Implemented
OR0424 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,470 $12,200 Implemented
OR0424 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $119,700 $241,870 Not Implemented
OR0423 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $518,000 $300,000 Not Implemented
OR0423 # 02 Y:2002 02 2002 $489,000 $410,000 n/a
OR0423 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $183,000 $120,860 Not Implemented