Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 1021 | Copper Ores |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0193 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $946 | $3,500 | Not Implemented |
UU0193 # 05 Y:2022 | 05 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,875 | $5,000 | Implemented |
UU0193 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,736 | $1,307 | Implemented |
UU0193 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,764 | $4,720 | Implemented |
UU0193 # 02 Y:2022 | 02 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $371,933 | $40,000 | Implemented |
UU0193 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $269,225 | $7,636,800 | Implemented |
UU0145 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $47,010 | $23,850 | Not Implemented |
UU0145 # 07 Y:2019 | 07 | 2019 | USE PHOTOCELL CONTROLS | $661 | $440 | Implemented |
UU0145 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $4,719 | Implemented |
UU0145 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $25,041 | $5,000 | Not Implemented |
UU0145 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,566 | $36,000 | Implemented |
UU0145 # 02 Y:2019 | 02 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $373,488 | $10,000 | Not Implemented |
UU0145 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $377,567 | $872,000 | Not Implemented |
OR0392 # 01 Y:2001 | 01 | 2001 | INSTALL EMISSIONS CONTROLS TO INCREASE CAPACITY | $6,372,100 | $5,833,000 | Not Implemented |
OR0392 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $149,400 | $426,960 | Not Implemented |
OR0392 # 06 Y:2001 | 06 | 2001 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $200,000 | $493,000 | Not Implemented |
OR0392 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $137,600 | $58,600 | Not Implemented |
OR0392 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,400 | $7,500 | Implemented |
OR0392 # 03 Y:2001 | 03 | 2001 | REPLACE DIRECT FIRED WITH STEAM HEAT | $96,000 | $144,600 | Not Implemented |
OR0392 # 02 Y:2001 | 02 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,259,300 | $536,756 | Not Implemented |