IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
Reset
SIC 14 Nonmetallic Minerals, Except Fuels
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0045 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,253 $5,609 n/a
NT0045 # 05 Y:2025 05 2025 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $150,000 $100,000 n/a
NT0045 # 03 Y:2025 03 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $724 $950 n/a
NT0045 # 02 Y:2025 02 2025 UPGRADE CONTROLS ON COMPRESSORS $13,920 $30,800 n/a
NT0045 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,667 $138,252 n/a
NT0045 # 06 Y:2025 06 2025 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $150,000 $9,690 n/a
AS0599 # 03 Y:2025 03 2025 INSTALL BACK-UP EQUIPMENT $297,917 $1,360,000 n/a
AS0599 # 01 Y:2025 01 2025 BURN A LESS EXPENSIVE GRADE OF FUEL $625,275 $321,478 n/a
AS0599 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,723 $5,870 n/a
AS0599 # 02 Y:2025 02 2025 REDESIGN PROCESS $778,933 $500,000 n/a
OR0781 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $112,997 $116,429 Not Implemented
OR0781 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,665 $20,839 Not Implemented
OR0781 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $618 $2,576 Implemented
OR0781 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $486,797 $4,030,000 Not Implemented
LE0550 # 05 Y:2023 05 2023 ELIMINATE A BY-PRODUCT $85,450 $350,000 Implemented
LE0550 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,791 $34,566 Implemented
LE0550 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,663 $100 Implemented
LE0550 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,474 $2,500 Implemented
LE0550 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $299 $1,150 Not Implemented
LE0550 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,539 $3,500 Implemented
LE0550 # 06 Y:2023 06 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,500 $22,000 Not Implemented
UU0202 # 03 Y:2022 03 2022 INCREASE USE OF AUTOMATION $47,100 $168,000 Not Implemented
UU0202 # 01 Y:2022 01 2022 BURN A LESS EXPENSIVE GRADE OF FUEL $459,131 $54,000 Implemented
UU0202 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $37,811 $120,000 Not Implemented
UU0202 # 02 Y:2022 02 2022 INCREASE USE OF AUTOMATION $160,040 $264,000 Implemented