IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 16 Heavy Construction, Ex. Building
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0627 # 09 Y:2022 09 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $516 $552 Implemented
WV0627 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,085 $50 Implemented
WV0627 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,727 $145 Implemented
WV0627 # 06 Y:2022 06 2022 UPGRADE CONTROLS ON COMPRESSORS $5,499 $3,930 Implemented
WV0627 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,341 $12,560 Not Implemented
WV0627 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $7,539 $4,229 Not Implemented
WV0627 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,979 $36,800 Not Implemented
WV0627 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,877 $5,625 Not Implemented
WV0627 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,156 $10,857 Not Implemented
CW0118 # 02 Y:2021 02 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,972 $0 Not Implemented
CW0118 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $65,757 $2,574 Not Implemented
CW0118 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $331 $458 Not Implemented
CW0118 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $479 $750 Not Implemented
CW0118 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,306 $0 Not Implemented
CW0118 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $731 $0 Not Implemented
UU0191 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,303 $150 Implemented
UU0191 # 08 Y:2021 08 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $114 $50 Implemented
UU0191 # 07 Y:2021 07 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $154 $71 Not Implemented
UU0191 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,172 $2,482 Not Implemented
UU0191 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $4,613 Implemented
UU0191 # 03 Y:2021 03 2021 USE SOLAR HEAT FOR HEAT $4,877 $10,800 Not Implemented
UU0191 # 02 Y:2021 02 2021 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,428 $14,400 Implemented
UU0191 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,749 $38,000 Implemented
UU0189 # 06 Y:2021 06 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $403 $100 Implemented
UU0189 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,609 $100 Implemented