IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 162 Heavy Construction, Except Highway
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0118 # 02 Y:2021 02 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,972 $0 Not Implemented
CW0118 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $331 $458 Not Implemented
CW0118 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $479 $750 Not Implemented
CW0118 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,306 $0 Not Implemented
CW0118 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $731 $0 Not Implemented
CW0118 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $65,757 $2,574 Not Implemented
UU0191 # 08 Y:2021 08 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $114 $50 Implemented
UU0191 # 07 Y:2021 07 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $154 $71 Not Implemented
UU0191 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,172 $2,482 Not Implemented
UU0191 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $4,613 Implemented
UU0191 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,303 $150 Implemented
UU0191 # 03 Y:2021 03 2021 USE SOLAR HEAT FOR HEAT $4,877 $10,800 Not Implemented
UU0191 # 02 Y:2021 02 2021 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,428 $14,400 Implemented
UU0191 # 01 Y:2021 01 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,749 $38,000 Implemented
UU0189 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,075 $2,348 Not Implemented
UU0189 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,665 $1,000 Not Implemented
UU0189 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,609 $100 Implemented
UU0189 # 06 Y:2021 06 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $403 $100 Implemented
UU0189 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,084 $14,000 Implemented
UU0189 # 01 Y:2021 01 2021 SIZE TRUCKS TO JOB $14,756 $56,000 Not Implemented
UU0188 # 06 Y:2021 06 2021 SIZE TRUCKS TO JOB $10,780 $56,000 Not Implemented
UU0188 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $3,863 Implemented
UU0188 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,107 $1,876 Not Implemented
UU0188 # 03 Y:2021 03 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,446 $14,800 Implemented
UU0188 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $5,049 $6,500 Not Implemented