IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0495 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $500 Implemented
IA0495 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $106 $35 Implemented
IA0495 # 07 Y:2013 07 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,715 $11,000 Implemented
WM0023 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,281 $1,625 Implemented
WM0023 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $494 Implemented
WM0023 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,427 $630 Implemented
WM0023 # 08 Y:2013 08 2013 IMPROVE SPACE COMFORT CONDITIONING $27,144 $5,800 Implemented
BS0009 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,591 $260 Implemented
BS0009 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,077 $689 Implemented
BS0009 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,037 $126 Implemented
BS0009 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $5,422 $3,959 Implemented
AM0634 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,630 $12,080 Implemented
AM0634 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,620 $1,000 Implemented
AM0634 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,780 $60 Implemented
AM0634 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $510 $0 Implemented
AM0634 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $297 $1,520 Implemented
UD0877 # 01 Y:2013 01 2013 ELIMINATE THIRD SHIFT $75,782 $0 Implemented
UD0877 # 02 Y:2013 02 2013 METER WASTE WATER $18,660 $1,000 Implemented
UD0877 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,095 $0 Implemented
UD0877 # 08 Y:2013 08 2013 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $61,182 $25,000 Implemented
UD0877 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $685 $2,000 Implemented
SF0429 # 02 Y:2013 02 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $578 $810 Implemented
SF0429 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $9,736 $36,817 Implemented
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented