Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,751
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0298 # 02 Y:2008 | 02 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,587 | $152 | Implemented |
LL0298 # 03 Y:2008 | 03 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,972 | $240 | Implemented |
DL0015 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,400 | $3,500 | Implemented |
DL0015 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,500 | $20,000 | Implemented |
DL0015 # 04 Y:2008 | 04 | 2008 | ADD AREA LIGHTING SWITCHES | $370 | $1,500 | Implemented |
DL0015 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,911 | $2,500 | Implemented |
DL0015 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,249 | $18,000 | Implemented |
LL0295 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,016 | $760 | Implemented |
LL0295 # 08 Y:2008 | 08 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $265 | $152 | Implemented |
UF0412 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,683 | $42,414 | Implemented |
UF0412 # 03 Y:2008 | 03 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $12,505 | $731 | Implemented |
UF0412 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $17,781 | $615 | Implemented |
UF0412 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,521 | $0 | Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
UW0017 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $694 | $982 | Implemented |
UW0016 # 01 Y:2008 | 01 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,638 | $0 | Implemented |
UW0016 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $7,000 | $500 | Implemented |
UW0016 # 05 Y:2008 | 05 | 2008 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,625 | $8,550 | Implemented |
UW0013 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $544 | $0 | Implemented |
UA0021 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,811 | $2,000 | Implemented |
UA0021 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,288 | $3,000 | Implemented |
UA0021 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,835 | $0 | Implemented |
UA0021 # 07 Y:2008 | 07 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $6,002 | $986 | Implemented |