IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,728

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0172 # 16 Y:1999 16 1999 USE UTILITY CONTROLLED POWER MANAGEMENT $44,655 $23,000 Implemented
ORS003 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,492 $7,459 Implemented
ORS003 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $39,677 $20,000 Implemented
ORS003 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $700 Implemented
ORS003 # 08 Y:1999 08 1999 USE OTHER WASTE CONCENTRATION METHODS $39,020 $34,600 Implemented
ORS003 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $80,220 $15,400 Implemented
ORS002 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,472 $27,939 Implemented
ORS002 # 02 Y:1999 02 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,055 $15,400 Implemented
ORS002 # 03 Y:1999 03 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $880 $700 Implemented
ORS002 # 04 Y:1999 04 1999 REPLACE BOILER $12,100 $0 Implemented
ORS002 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $166,000 $121,000 Implemented
ORS002 # 08 Y:1999 08 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $5,954 $0 Implemented
ORS001 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,190 $10,700 Implemented
ORS001 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,070 $0 Implemented
ORS001 # 06 Y:1999 06 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,829 $700 Implemented
ORS001 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $1,960 $0 Implemented
MA0445 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,546 $472 Implemented
MA0445 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $353 $1,090 Implemented
CO0446 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $1,000 Implemented
CO0446 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0446 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $530 $0 Implemented
BD0141 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,301 $500 Implemented
KU0524 # 01 Y:1999 01 1999 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,520 $18,350 Implemented
KU0524 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,110 $2,500 Implemented
KU0524 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,820 $3,790 Implemented