IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0529 # 04 Y:2018 04 2018 INSULATE BARE EQUIPMENT $631 $1,040 Implemented
SF0529 # 05 Y:2018 05 2018 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,200 $13,166 Implemented
AS0460 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $1,542 $300 Implemented
AS0460 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $1,624 Implemented
AS0460 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $190 $375 Implemented
WM0126 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,236 Implemented
WM0126 # 06 Y:2018 06 2018 REPAIR OR REPLACE STEAM TRAPS $7,154 $6,480 Implemented
GT0918 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $3,016 $1,488 Implemented
GT0918 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,414 $3,500 Implemented
GT0918 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,373 $5,449 Implemented
GT0918 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $232 $1,000 Implemented
LS1812 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,886 $17,000 Implemented
IP0107 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,310 $596 Implemented
IP0107 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,840 $3,587 Implemented
IP0107 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $957 $2,201 Implemented
IP0107 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,646 $9,560 Implemented
IP0107 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $7,858 Implemented
IP0107 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,878 $39,406 Implemented
IP0107 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $2,219 Implemented
IP0107 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $18,691 $85,000 Implemented
LS1810 # 02 Y:2018 02 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $880 $340 Implemented
LS1810 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $1,088 Implemented
LS1810 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $764 $1,800 Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
MZ0257 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,800 Implemented