IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0186 # 01 Y:1996 01 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,586 $16,140 Implemented
AS0186 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,274 $5,945 Implemented
AS0186 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,734 $7,000 Implemented
AS0186 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,738 $0 Implemented
AS0186 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $2,086 Implemented
AS0186 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $712 $525 Implemented
AS0186 # 07 Y:1996 07 1996 METER WASTE WATER $8,798 $5,000 Implemented
AS0186 # 08 Y:1996 08 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $465 $0 Implemented
AS0185 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,866 $0 Implemented
AS0185 # 02 Y:1996 02 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,309 $255 Implemented
AS0185 # 03 Y:1996 03 1996 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $416 $120 Implemented
AS0185 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $882 $100 Implemented
AS0185 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,378 $1,938 Implemented
AS0185 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $128 Implemented
AS0185 # 10 Y:1996 10 1996 IMPROVE HANDLING PRACTICES $3,909 $1,500 Implemented
AS0180 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,978 $14,977 Implemented
AS0180 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $63,244 $50,000 Implemented
AS0180 # 09 Y:1996 09 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,648 $30 Implemented
AS0180 # 10 Y:1996 10 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $330 $30 Implemented
AS0180 # 11 Y:1996 11 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,041 $1,780 Implemented
AS0162 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $1,386 Implemented
AS0162 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $159 $0 Implemented
AS0162 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $145 $173 Implemented
AS0127 # 02 Y:1994 02 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $806 $0 Implemented
AS0127 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $272 $100 Implemented