IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0458 # 04 Y:2018 04 2018 REPLACE BOILER $101,732 $175,000 Implemented
SU0458 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $104 $146 Implemented
SU0458 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $258 Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented
UU0131 # 01 Y:2018 01 2018 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $242,000 $1,000 Implemented
UU0131 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,380 $1,000 Implemented
UU0131 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,471 $39,272 Implemented
UU0131 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $17,732 $2,030 Implemented
UU0131 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,477 $150 Implemented
UU0131 # 07 Y:2018 07 2018 INSTALL REPLACEMENT DOORS $4,539 $300 Implemented
UF0515 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,829 $63,355 Implemented
UF0515 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,104 $23,300 Implemented
UF0515 # 04 Y:2018 04 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $11,421 $29,224 Implemented
UF0515 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,553 $2,800 Implemented
UF0515 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,453 $512 Implemented
NL0020 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,414 $29,401 Implemented
NL0020 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $1,869 $56 Implemented
NL0020 # 04 Y:2018 04 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $81 $200 Implemented
SF0516 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,768 $350 Implemented
SF0516 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $300 Implemented
SF0516 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $875 $200 Implemented
SF0516 # 05 Y:2018 05 2018 REPAIR AND ELIMINATE STEAM LEAKS $488 $200 Implemented