Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,751
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0695 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,250 | $23,365 | Implemented |
SD0491 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $310 | $200 | Implemented |
SD0490 # 01 Y:2014 | 01 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,150 | $3,300 | Implemented |
SD0490 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,773 | $3,775 | Implemented |
SD0490 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $440 | $200 | Implemented |
MZ0156 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,514 | $71,320 | Implemented |
MZ0156 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,480 | $2,000 | Implemented |
MZ0156 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,460 | $400 | Implemented |
MZ0156 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,886 | $4,400 | Implemented |
MZ0156 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,068 | $30,128 | Implemented |
MZ0156 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,514 | $141,366 | Implemented |
MZ0156 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,299 | $10,282 | Implemented |
UK1406 # 01 Y:2014 | 01 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $84,218 | $192,800 | Implemented |
UK1406 # 02 Y:2014 | 02 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $20,868 | $60,000 | Implemented |
UK1406 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $18,647 | $49,610 | Implemented |
UK1406 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $930 | $1,845 | Implemented |
UK1406 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $13,621 | $15,000 | Implemented |
UK1406 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,190 | $0 | Implemented |
UK1406 # 08 Y:2014 | 08 | 2014 | ADD AREA LIGHTING SWITCHES | $1,572 | $620 | Implemented |
UK1406 # 09 Y:2014 | 09 | 2014 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,736 | $2,479 | Implemented |
UK1406 # 10 Y:2014 | 10 | 2014 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $612 | $2,154 | Implemented |
UK1406 # 11 Y:2014 | 11 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $100 | $90 | Implemented |
UK1406 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,015 | $700 | Implemented |
LE0386 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $32 | Implemented |
LE0386 # 02 Y:2014 | 02 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $61,300 | $2,592 | Implemented |