IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,751

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0386 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,910 $1,000 Implemented
LE0386 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,975 $10,000 Implemented
LE0386 # 06 Y:2014 06 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $12,502 $16,700 Implemented
LE0386 # 09 Y:2014 09 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $757 $2,250 Implemented
MI0267 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $18,615 $80,000 Implemented
MI0267 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,029 $3,340 Implemented
MI0267 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,950 $429 Implemented
OR0636 # 03 Y:2014 03 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,708 $7,000 Implemented
UK1405 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $20,457 $15,610 Implemented
UK1405 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $46,464 Implemented
UK1405 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $15,146 $1,540 Implemented
UK1405 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,374 $24,100 Implemented
UK1405 # 12 Y:2014 12 2014 INSULATE FEEDWATER TANK $3,480 $1,769 Implemented
UK1405 # 14 Y:2014 14 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $30 Implemented
UK1405 # 04 Y:2014 04 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $32,296 $39,600 Implemented
UK1405 # 06 Y:2014 06 2014 REPAIR AND ELIMINATE STEAM LEAKS $27,426 $2,678 Implemented
LE0382 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,599 $0 Implemented
LE0382 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $555 $0 Implemented
LE0382 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,119 $0 Implemented
LE0382 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,433 $8,016 Implemented
BS0039 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $353 $214 Implemented
BS0039 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $1,366 Implemented
BS0039 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $241 Implemented
BS0039 # 05 Y:2014 05 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,992 $4,512 Implemented
BS0039 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $81 $87 Implemented