IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0278 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,040 $600 Implemented
IP0166 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $665 Implemented
IP0166 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $1,162 Implemented
IP0166 # 10 Y:2022 10 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $665 Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0166 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $33 Implemented
IP0166 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $416 Implemented
IP0166 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,623 $0 Implemented
IP0166 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,625 $3,274 Implemented
IP0161 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $128 $328 Implemented
IP0161 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $94 $0 Implemented
IP0161 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $262 $724 Implemented
IP0161 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $0 Implemented
IP0161 # 03 Y:2022 03 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,152 $88 Implemented
UD1012 # 07 Y:2020 07 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $49,540 $21,295 Implemented
UD1012 # 06 Y:2020 06 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $67,773 $0 Implemented
UD1012 # 17 Y:2020 17 2020 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $24,810 $35,000 Implemented
UD1012 # 09 Y:2020 09 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,338 $0 Implemented
UD1012 # 15 Y:2020 15 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,548 $0 Implemented
UD1012 # 16 Y:2020 16 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,160 $0 Implemented
UD1012 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,178 $1,000 Implemented
UD1012 # 14 Y:2020 14 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,073 $0 Implemented
IC0231 # 05 Y:2020 05 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,416 $0 Implemented
IC0231 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,211 $50,440 Implemented
IC0231 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,285 $6,673 Implemented